Chemical Engineering
Frank Delborty
Abstract
Construction of hydropower, wind, solar, nuclear, geothermal and recycling power plants. It is one of the solutions that the experts in this field of energy production have succeeded so far and have made significant progress in the world by presenting appropriate plans. Iran also did not hold back from ...
Read More
Construction of hydropower, wind, solar, nuclear, geothermal and recycling power plants. It is one of the solutions that the experts in this field of energy production have succeeded so far and have made significant progress in the world by presenting appropriate plans. Iran also did not hold back from this convoy and by building hydropower plants and using the potential of the country's surface water, which amounts to 50. TVVH / y annual energy production by this type of power plants, has taken a step that the vision It puts a light in front of it. Attention and emphasis on sustainable and economic development of energy supply in the national sphere, reduction of greenhouse gases to prevent environmental degradation, expansion of production capacities and increase of energy revenues, replacement of fossil products including oil and gas in power plants, maximum use. The potential of the country's hydroelectric power and ultimately the economic efficiency of this type of power plants during operation to balance the supply of cheap energy to consumers is one of the goals of the energy production sector in our country. In order to implement these goals, the Ministry of Energy based on coherent and purposeful planning in order to realize the full utilization of hydropower generation facilities, which in this context in the framework of energy development and diversification of Iran water and power resources development company, which is organized. He is one of the specialists in the design and construction of hydropower plants, and in the form of this company, he was able to carry out the planned programs in the hydropower sector.
Chemical Engineering
Tayeb Mahmut
Abstract
Referring to the need for three factors of capital, materials and machinery and manpower in the implementation of development projects in the country, he said: "The private sector will never accept investment in projects without considering the profit." Engineer Droudian added: "Since water projects ...
Read More
Referring to the need for three factors of capital, materials and machinery and manpower in the implementation of development projects in the country, he said: "The private sector will never accept investment in projects without considering the profit." Engineer Droudian added: "Since water projects are not feasible in the short term, so the capital is locked for a long time and on the other hand, even after operation, the project does not have a good return." Referring to finding a way to improve the efficiency of projects, he said: 94% of the country's extracted water is consumed in the agricultural, industrial and domestic sectors without any restrictions and disproportionate to the efficiency and price of water input, and according to the water market in Iran, efficiency The desired capital will not be realized after the completion of the project. "Many investors and contractors believe that in the implementation of projects by the private sector, projects are expected to be key in hand so that the private sector can put the projects into operation in the shortest possible time, and as a result, the project," he said. Have an acceptable profitability.